{"id":52385,"date":"2024-12-23T02:00:40","date_gmt":"2024-12-23T07:00:40","guid":{"rendered":"https:\/\/wp.desales.edu\/dsu-daily\/?p=52385"},"modified":"2024-12-20T14:53:18","modified_gmt":"2024-12-20T19:53:18","slug":"electrical-shutdown-planned-for-campus-buildings-2","status":"publish","type":"post","link":"https:\/\/wp.desales.edu\/dsu-daily\/2024\/12\/23\/electrical-shutdown-planned-for-campus-buildings-2\/","title":{"rendered":"Electrical Shutdown Planned for Campus Buildings"},"content":{"rendered":"<p style=\"font-weight: 400;\">Campus environment will be conducting an electrical shutdown for high voltage electrical preventative maintenance on Thursday, Dec. 26, or rain date Friday, Dec. 27, in the following buildings on campus:<\/p>\n<ul>\n<li>Gambet Center.<\/li>\n<li>University Center.<\/li>\n<li>Dooling Hall.<\/li>\n<li>Wills Hall.<\/li>\n<li>Trexler Library.<\/li>\n<li>Labuda Theatre.<\/li>\n<li>DeChantal Hall.<\/li>\n<li>Conmy Hall.<\/li>\n<li>Tocik Hall.<\/li>\n<li>University Villages.<\/li>\n<li>Aviat Hall.<\/li>\n<li>Annecy Hall.<\/li>\n<li>Donahue Hall.<\/li>\n<li>University Heights.<\/li>\n<\/ul>\n<p style=\"font-weight: 400;\">Power is only scheduled to be shut down one of those days. The Dorothy Day Student Center will be down Thursday, Dec. 26, and Friday, Dec. 27, for electrical upgrades.<\/p>\n<p style=\"font-weight: 400;\"><strong>Please shut down all electronic equipment in your area so it will not be affected.<\/strong><\/p>\n<p style=\"font-weight: 400;\"><strong>Questions?<\/strong> <a href=\"mailto:jim.molchany@desales.edu\" data-outlook-id=\"3001731e-73d6-4c2b-94a0-3c5e31cb3664\">jim.molchany@desales.edu<\/a> or ext. 1644<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Campus environment will be conducting an electrical shutdown for high voltage electrical preventative maintenance on Thursday, Dec. 26, or rain date Friday, Dec. 27, in the following buildings on campus: Gambet Center. University Center. Dooling Hall. Wills Hall. Trexler Library. Labuda Theatre. DeChantal Hall. Conmy Hall. Tocik Hall. University Villages. Aviat Hall. Annecy Hall. Donahue Hall. University Heights. Power is<\/p>\n<p><a class=\"more-link\" href=\"https:\/\/wp.desales.edu\/dsu-daily\/2024\/12\/23\/electrical-shutdown-planned-for-campus-buildings-2\/\">Read More<\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,6],"tags":[],"class_list":["post-52385","post","type-post","status-publish","format-standard","hentry","category-faculty","category-staff"],"_links":{"self":[{"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/posts\/52385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/comments?post=52385"}],"version-history":[{"count":2,"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/posts\/52385\/revisions"}],"predecessor-version":[{"id":52393,"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/posts\/52385\/revisions\/52393"}],"wp:attachment":[{"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/media?parent=52385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/categories?post=52385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wp.desales.edu\/dsu-daily\/wp-json\/wp\/v2\/tags?post=52385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}